Friday, April 16, 2010

Bangalore Directory Search Airtel Landline

Dam Visit Technical Visit

The Association completed on 8 April its annual visit to a public work. In this case it was Mularroya Dam, a dam of loose material with more than 90 m in height that also includes the construction of a water tunnel and a variant of road. All these actauciones be completed within 90 months.

The visit was primarily for professional engineers, geologists and students of the subject Constructive Techniques Complutense University. Also attended by people from diverse backgrounds such as mining engineers and forest téncicos interested in geotechnical and water sector.

The Association wishes to acknowledge the willingness shown at all times by those responsible for the works. A D. Zaera Osavaldo Borobia, Director of Works (Ebro River Basin), D. Rodrigo Blas Temiño, Project Manager (joint venture formed by Acciona Mularroya-Sacyr) for your attention and explanations provided at all times and D. Álvaro Manuel Benito (TYPSA Technical Assistance).

is also grateful for the attention shown by D. Puell Fernando Marin, professor of the subject, which always worked on the clarification of doubts that it was very practical and didactic throughout the visit.

0 comments:

Post a Comment