Sunday, March 14, 2010

Milena Velba Coconut Oil

Mularroya Dam

The GTP AIGCM Training presents its annual technical visit to a public work. In this case if it is a visit to a hydraulic work, Mularroya Dam, currently under construction. This dam, which will have a maximum height of 100 m from the foundations have been designed with type of loose material.

hope that both geologists, engineers and other professional partners interested in hydraulic beneficiƩis you a visit so interesting. Those interested in joining the organized tour can do so at the following link: